Block Adhesive-Application Guidelines
- Surface Preparation:
- Clean the surface from loose particles, dirt, oil, and grease.
- Repair any cracks or defects before application.
- Mixing of Adhesive:
- Mix adhesive thoroughly with water (25-30% by weight).
- Use clean potable water for optimal results.
- Application:
- Apply a thin layer (3-5mm) of adhesive on AAC blocks.
- Ensure proper alignment and jointing.
- Clean excess adhesive immediately.
Ready Mix Plaster-Application Guidelines
- Internal: 8 -10 mm single coat is recommended for internal plaster covering.
- External: Two coats are recommended to cover the external side of walls i.e. base coat of 6-8mm and second finish coat 8-12mm to get total thickness of around 18-20mm, further depending upon site conditions. After base coat, minimum 2 to 3 days curing must be done before application of finish coat. Single coat or base coat must not be greater than 15mm.